Hero background
Fire-Rated Ducts for Cellulosic Fire Protection

Fire-Rated Ducts for Cellulosic Fire Protection

Fire-rated duct systems for ventilation, smoke extract and service routes, coordinated with supports, access panels, penetrations and the building’s compartmentation strategy.

Background Pattern
Purpose of Fire-Rated Ducts

Purpose of Fire-Rated Ducts

Designed to control smoke and fire spread through HVAC systems, networks, and fire-rated ducts, they are used in commercial buildings and industrial facilities to protect escape routes and maintain compartmental integrity.

Contain the smoke and flames that spread through the ventilation duct pathways

Protect critical building zones by maintaining fire compartment boundaries

Maintain HVAC system integrity during fire exposure for longer durations

Support safe evacuation by reducing smoke transfer into escape routes

Ceilings Configurations

Transformer Room Fire-Rated Ceiling Systems

Transformer Room Fire-Rated Ceiling Systems

Background Pattern
Fire Performance and Engineering Capability

Fire Performance and Engineering Capability

  • Cellulosic fire curve compliance
  • Fire resistance up to defined durations (e.g., EI ratings)
  • Structural stability under sustained fire exposure
  • Impact and environmental durability
  • Combined fire and blast resistance

Integrated Fire Compartmentation

Fire-rated duct systems are engineered to support a coordinated passive fire protection strategy across a building. They integrate with nearby fire-rated walls, floors and shafts to maintain continuous compartment boundaries. This ensures compartment integrity is preserved even where ductwork penetrates critical fire separations.

Fire Dampers & Sealing

Fire Dampers & Sealing

To protect fire barriers where duct penetrations occur

 Duct Wrapping & Encasement

Duct Wrapping & Encasement

For maintaining fire resistance without structural duct replacement

 Smoke Control Ductwork

Smoke Control Ductwork

To support safe smoke extraction and controlled air movement

 Seamless Building Integration

Seamless Building Integration

Ensuring compatibility with ceilings, shafts, and wall assemblies

Sectors We Serve

We partner with you to deliver reliable, purpose-built infrastructure that supports your goals and performs where it matters most.

Energy & Utilities

Energy & Utilities

Pattern

Energy & Utilities

  • Power & Grid Infrastructure
  • Energy & Process Facilities
  • Onshore & Offshore Assets
  • Renewables & Energy Transition
Industrial

Industrial

Pattern

Industrial

  • Chemical & Process Plants
  • Manufacturing & Heavy Industry
  • Hazardous & Controlled Storage
  • Automotive & Industrial Campuses
Transportation

Transportation

Pattern

Transportation

  • Airports & Aviation Infrastructure
  • Metro, Rail & Mass Transit
  • Roads, Highways & Vehicular Tunnels
  • Ports, Shipyards & Marine Transport
Defence

Defence

Pattern

Defence

  • Defence & Command facilities
  • Critical National Infrastructure (CNI)
  • Secure & Hardened Assets
  • Border, Coastal & Strategic Installations
Infrastructure

Infrastructure

Pattern

Infrastructure

  • Data Centres & Digital Infrastructure
  • Public Venues & Stadia
  • Cultural & Institutional Buildings
  • Government & Diplomatic Facilities
Commercial/Mixed-Use

Commercial/Mixed-Use

Pattern

Commercial/Mixed-Use

  • Hospitality & Leisure
  • Financial & Commercial Buildings
  • Mixed-Use Landmark Developments

Certification

SECURA’s solutions meet or exceed leading international standards.

EN 1363 / EN 1364 /  EN 13501

EN 1363 / EN 1364 / EN 13501

European standards governing fire resistance testing and classification for building elements

BS 476 Part 20–24

BS 476 Part 20–24

British Standard for fire testing of building materialFire resistance of elements (walls, floors, ceilings, and fire doors etc

NFPA 502 / NFPA 251

NFPA 502 / NFPA 251

NFPA 502: Standard for Road Tunnels, Bridges, and Other Limited Access Highway

Inputs for Specifying Fire-Rated Ducts for Cellulosic Fire Protection

Use the project brief and coordinated drawings to confirm the following inputs before detailed selection.

  • Duct function and fire exposure

    Confirm whether the duct supports ventilation, smoke extract or another service, together with the relevant cellulosic fire exposure.

  • Required performance classification

    Define the required fire performance from the approved fire strategy and project specification.

  • Route, dimensions and support layout

    Provide the duct route, dimensions, orientation, support positions and relevant wall or floor crossings.

  • Access, inspection and maintenance

    Identify access panels, inspection points and maintenance requirements before the duct protection arrangement is finalised.

Frequently Asked Questions About Fire-Rated Ducts for Cellulosic Fire Protection

Answers to common selection, coordination and evidence questions.

Begin with duct function, fire exposure, required classification, route, dimensions, pressure duty, support layout and access. Clear drawings and acceptance criteria help the technical team assess an appropriate configuration without assuming that one arrangement suits every project.

Review duct joints, access panels, hangers, anchors, wall and floor penetrations and adjoining fire-resisting construction. These details form part of the installed system and should be resolved before fabrication or installation.

Review tested duct, support and penetration details relevant to the proposed dimensions, orientation and operating duty. The evidence should match the proposed materials, dimensions, orientation and interfaces rather than being treated as a general approval for every use.

It may be considered for commercial, industrial and infrastructure buildings where ductwork passes through or serves fire compartments. Final suitability depends on the project brief, site conditions and supporting technical evidence.

Retrofit use may be possible after the existing structure, available space, access and interfaces have been surveyed. The proposed arrangement must then be checked against the project requirement and the evidence available for that configuration.

Provide relevant drawings, duct function, fire exposure, required classification, route, dimensions, pressure duty, support layout and access, along with programme constraints and the documentation required for review. This helps define the scope and identify any information that must be confirmed by the project team.

CTA Background

Need Help Choosing the Right Fire Rated Duct System?

Share duct function, fire exposure, required classification, route, dimensions, pressure duty, support layout and access so the project requirements, interfaces and available supporting evidence can be reviewed.