Hero background
Case Study

Fire-Rated OTE Ductwork: Protecting Doha Metro’s Underground Network

Qatar Rail is a railway company owned and operated by the Government of Qatar. Established in 2011 as part of the Qatar National Vision 2030.

Project logo
Application
OTE (Over Track Exhaust) Duct
Size
4.2m x 1.2m
Total Length
1,645 lm
Fire Rating
2 Hours
Pressure Rating
±2,500Pa

Company Profile

Qatar Rail is a railway company owned and operated by the Government of Qatar. Established in 2011 as part of the Qatar National Vision 2030, Qatar Rail is responsible for designing, commissioning, building, operating and maintaining all rail networks within the State of Qatar, including the famous Doha Metro, widely recognised as one of the world’s most advanced metro systems.

Overview

Invicta ANARA was approached to design and install an Over Track Exhaust (OTE) duct in five underground stations on Doha Metro’s Red Line South, at an average depth of 20–30 metres below ground level.

  • The OTE forms part of the Tunnel Ventilation System (TVS) and has three primary functions:
  • To extract waste heat from trains and provide regular air extraction/circulation (“normal mode of operation”)
  • To extract hot air from the tunnel system produced by the trains when they come to a halt inside a tunnel (“congested mode”)
  • To extract hot smoke out to the atmosphere during a train fire or station fire, allowing people to evacuate the station safely (“emergency mode”)

The arrangement of each station consisted of a single central platform 165m in length, with a 4-sided OTE duct located approximately 5m above the full length of each track on either side of the platform. These would be connected together by a crossover plenum ceiling at each end of the platform above the Tunnel Power Supply (TPS) room, which returns to the Tunnel Ventilation System shaft. This shaft contains a series of extraction fans, which then exhaust the smoke up to ground level.

This would be one of Invicta ANARA’s most expansive and high-profile projects, with an estimated timeframe of two years and a team size of 160 operatives. The OTE duct system would have to provide a 2-hour fire rating in both directions (“Type A” fire outside to inside and “Type B” fire inside to outside), and would require a design life of 30 years.

Technical Constraints

The OTE would have to withstand the internal extraction fan pressure of −1000Pa, as well as the piston effect pressure generated by the trains passing on the underside of ±1500Pa, meaning a net pressure of ±2500Pa. The OTE would also have to allow for foot traffic on the inside, to allow maintenance personnel to walk inside the duct.

In order for equipment to be delivered to the track level, there was a large opening in the concrete slab midway along the track area on each OTE. As this was located directly along the OTE route, the OTE in this section would have to transition from a 4-sided OTE to a 2-sided OTE, using the concrete wall and slab as the other two sides and traversing around the opening.

Due to its large size, the OTE would also need to be pre-fabricated on the track level and then lifted and installed from mobile scaffolding and scissor lifts. This decision was made in careful consideration of personnel health and safety, including the lifting and fixing methodology and relevant best practices.

Project Video

Invicta has proven to be a valuable partner for RLS-JV with its expertise, commitment and professionalism shown throughout the project and the works being delivered on time and to the highest standards

RLS-JV | Senior Project Director