Fire Rated Ceilings Protect Riyadh Bus Rapid Transit System

The Riyadh Bus Stops and Bus Rapid Transit System Project is an integral part of the transportation infrastructure being developed for the city of Riyadh, including the new Riyadh Metro.

Project logo
Client
Riyadh Bus
Application
Fire Rated Ceiling
Fire Rating
2 Hours Integrity and Insulation
Other Performance Criteria
Maximum surface temperature of 140°C on the non fire side
Team Size
12 Invicta ANARA Engineers

Company Profile

The Riyadh Bus Stops and Bus Rapid Transit System Project is an integral part of the transportation infrastructure being developed for the city of Riyadh, including the new Riyadh Metro.

The project provides distinctive stations for the Bus Rapid Transit system, along with a comprehensive network of comfortable and functional passenger facilities.

Phase 1 includes the construction of seven bus lines with 408 architecturally designed and serviced passenger pick up facilities, 28 Bus Rapid Transit stations and two terminal stations.

The associated infrastructure includes 19 bridges serving the Bus Rapid Transit stations and two large Park and Ride areas. All but the smallest passenger pick up facilities are architecturally designed, enclosed and fully air conditioned.

Project Challenge

Invicta ANARA was appointed to design and install fire rated ceiling protection measuring 6.6 m wide by 24 m long.

The ceilings were required to protect three mechanical and electrical rooms, a corridor and a staircase area within the eastern and southern terminuses of the Riyadh bus network.

The ceiling system incorporated mineral wool insulation and was designed to contain an electrical fire within the affected room. It would prevent the fire from spreading through the void between the top of the room walls and the structural beams above.

The complete system needed to be suspended from the existing horizontal structural steel beams and approved in accordance with Certifire fire certification.

In the event of a fire, the ceiling also needed to limit the surface temperature on the non fire side to 140°C. This would reduce the exposure of the main building structure to high temperatures.

Technical Constraints

The ceilings had to be installed approximately 3 m above ground level. The existing supporting steel beams were positioned approximately 4.5 m above ground level.

The roof and its supporting trusses had already been installed. Access for fitting the ceiling frames, panels and insulation was therefore only possible from below using fixed scaffolding.

The installation also needed to accommodate several types of service penetration, including lighting, firefighting sprinkler pipes and cable trunking.

Dust and mineral wool residue created during the work required careful cleaning before the ceiling system could be inspected and completed.

Installed Solution

Invicta ANARA began the installation by fixing brackets and hangers to the existing structural beams.

The supporting framework, insulation and fire rated panels were then installed. One panel was left open in each room to provide temporary access above the ceiling. These openings were fully closed once the remaining work had been completed.

All components were inspected and cleaned following installation.

Standard mechanical anchor bolts could not be used in certain areas where hollow block walls were present. Chemical sleeve anchor bolts were used instead, without affecting the durability or integrity of the completed ceiling system.

End Result

A team of 12 Invicta ANARA engineers successfully completed the fire rated ceiling installation within eight weeks.

The completed system was inspected, approved and certified in accordance with the client’s specifications and fire protection requirements.