Case Study

Fire Rated Access Hatches Support Safety on Riyadh Metro

The FAST Consortium is one of three consortia responsible for the design and construction of the Riyadh Metro project.

Project logo
Client
Riyadh Metro
Application
Access Hatches
Fire Rating
2 Hours and 4 Hours Integrity Only
Other Performance Criteria
Water tight and or load bearing up to 20 kN/m², depending on location
Team Size
12 Invicta ANARA Engineers

Company Profile

The FAST Consortium is one of three consortia responsible for the design and construction of the Riyadh Metro project. Employing approximately 8,000 personnel, the consortium is led by Spain’s FCC, with partners including Samsung C&T, Alstom, Strukton, Atkins and Typsa.

Working across the Yellow, Green and Purple lines, the FAST Consortium is responsible for designing and constructing 64 km of the total 176 km metro network. Its scope also includes 24 stations, two depots, 69 advanced driverless trains and two precast yards where tunnel sections are constructed.

Line 5, also known as the Green Line, runs underground through a bored tunnel along King Abdulaziz Street. It extends between the King Abdul Aziz Historical Centre and Riyadh Airbase before connecting with King Abdullah Road.

The Green Line is almost 13 km long and includes 11 stations. It also contains two transfer stations where Line 5 connects with Lines 1 and 2.

Project Challenge

Invicta ANARA was appointed to design and install 230 hinged access hatches of different types and sizes throughout the Green Line tunnel system.

The scope included fire rated and non fire rated, lockable, water tight and load bearing access hatches. The performance requirements for each hatch depended on its location across the 11 stations and 12 emergency shafts.

Access hatches were also required within the Green Line depot. These would provide access for maintenance during normal operations and emergency access during a fire, allowing people to evacuate safely.

External facing hatches needed to be water sealed to prevent rainwater ingress. Some locations required fire rated and load bearing hatches capable of supporting traffic loads from above. Other areas required standard access hatches for regular use during normal operations.

Technical Constraints

Many of the access hatches had to be installed within or close to an operational road. This made the installation process particularly complex.

The work could only be completed during night shifts. This allowed the project team to use a boom truck without obstructing the movement of traffic during the day.

Some hatches had to be installed beside existing steel structures. Each hatch therefore needed to be designed around the surrounding structure while maintaining sufficient clearance for unrestricted operation.

Several large and heavy hatches had to be transported from ground level to the underground platform level, approximately 15 metres below. Lifting machinery could not access the installation locations.

These hatches had to be dismantled, moved manually to platform level, reassembled and installed directly over the designated openings.

Water seals were required for all hatches exposed to the weather. Every hatch also needed a painted finish that would blend with the surrounding environment and provide corrosion resistance against the elements.

Installed Solution

Invicta ANARA installed the hatches located within the road during night shifts using a boom truck.

Water gaskets and sealants were applied around the perimeter of each weather exposed hatch. The completed installations were then tested with water to confirm the effectiveness of the sealing arrangement.

All access hatches were painted away from the project site before delivery. They were cleaned after installation to achieve the required finished appearance.

Each access hatch was secured to the concrete slab using standard mechanical anchor bolts. The hatches were designed so that one person could open them manually without requiring powered equipment.

Selected hatches were also engineered to support traffic loads, allowing vehicles to pass safely across their upper surfaces.

Key Benefits

A team of 12 Invicta ANARA engineers successfully installed all 230 access hatches within a period of two months.

The hatches were designed to integrate with the surrounding finishes across both public areas and operational areas. The installation programme also allowed road traffic to continue during the day without disruption.

The completed access hatch system provides secure access for routine maintenance while supporting emergency access and safe evacuation requirements across the Riyadh Metro Green Line.