Fire Barriers for Underground Tunnels at Jebel Ali Desalination Plant

The Dubai Electricity and Water Authority Jebel Ali Desalination Plant is located in Dubai. At the time of the project, it was described as the largest desalination plant in the world.

Project logo
Client
Dubai Electricity and Water Authority
Application
Cable Tunnel Cross Barriers
Number of Locations
79
Fire Rating
2 Hours
Barrier Size
2.80 m Wide by 2.20 m High

Company Background

The Dubai Electricity and Water Authority Jebel Ali Desalination Plant is located in Dubai. At the time of the project, it was described as the largest desalination plant in the world.

The facility has an electrical generation capacity of 2,000 MW and can purify approximately 480 million litres of seawater every day. Fire protection systems have been installed across the facility to support the safety and continued operation of its essential infrastructure.

Project Challenges

An extensive network of underground tunnels and cable routes connects the different buildings across the site. These routes contain cables that are critical to the operation of the desalination plant.

Invicta ANARA worked with site consultant Fichtner Consulting Engineers and main contractor Doosan Heavy Industries and Construction to provide fire barriers throughout the underground network.

The barriers were required to contain the spread of fire and limit potential damage to the cables, equipment and connected facilities. They were installed in the following locations:

  1. Between building basements and cable trenches or tunnels
  2. Between cable trenches and cable tunnels
  3. Between trenches and escape routes, including ladders and exits

Technical Constraints

Fire barriers were required at 79 separate locations within the underground tunnel network. Every barrier needed to provide two hours of fire protection.

The barriers also had to withstand frequent daily use because the integrated access doors would be opened and closed several times each day.

Each system needed to be fully demountable and relocatable. This would allow the barriers to be removed or repositioned if future maintenance, equipment access or changes to the underground services were required.

The harsh underground conditions and restricted manoeuvring space presented further installation challenges. The project team therefore needed to plan each stage carefully while maintaining access to the cable routes.

Installed Solution

Invicta ANARA installed fire rated barriers measuring 2.80 m wide by 2.20 m high at each designated tunnel location.

Every barrier incorporated one access door providing two hours of fire protection. Cut out provisions were created for six cable trays on each side of the door. The remaining spaces around the cable penetrations were sealed using FireBat material to maintain the required fire performance.

Due to the limited working space within the tunnels, each barrier was installed in phases. Initial provisions were created to allow the cables to be pulled through the barrier locations. The access doors and penetration sealing were then installed once the cable work had been completed.

Despite the restricted conditions, each complete barrier, including the access door and penetration sealing, was erected in less than two working days.

Following the successful completion of the tunnel barriers, the same system was specified for use as removable generator barriers elsewhere within the Jebel Ali facility.