Corrosion-Resistant GRP Sump Flooring for Etihad Rail

Etihad Rail is the national railway network of the United Arab Emirates. Designed to help diversify the country’s economy in line with UAE Vision 2021 and Abu Dhabi Economic Vision 2030.

Project logo
APPLICATION
Battery Storage Sump Flooring
LOAD CAPACITY
Up to 17.5 kN/m²
PROJECT DURATION
5 Days

Company Background

Etihad Rail is the national railway network of the United Arab Emirates. Designed to help diversify the country’s economy in line with UAE Vision 2021 and Abu Dhabi Economic Vision 2030, Etihad Rail is responsible for connecting major population centres across the UAE and linking them with other major cities in the Gulf region.

Construction of Stage One was undertaken in partnership with Deutsche Bahn and completed in 2016. At the time of this project, construction of Stage Two was underway, involving 605 km of railway lines and several freight facilities. Construction began in April 2020 and involved numerous delivery partners from Europe and Asia.

Project Challenges

Invicta ANARA was asked to design a corrosion-resistant, load-bearing flooring solution for two battery-storage areas within the hazardous-material stores serving the Etihad Rail Stage 2 project.

As batteries would remain in these areas for extended periods, the flooring needed to manage the risk of a battery-acid leak. Any leaked acid had to flow freely through the flooring and drain into the sump pit below rather than accumulating around the batteries.

The selected system therefore needed to resist battery acid, support the required operational loads and provide suitable access across the storage areas.

Technical Constraints

Both the supporting profiles and gratings needed to resist corrosion caused by battery acid. Any deterioration could affect the strength and long-term performance of the flooring system.

The system also had to support loads of up to 17.5 kN/m² while allowing battery acid to drain into the sump below. The supporting profiles needed to follow the different slopes within each sump pit without reducing the structural strength of the completed installation.

A conventional solution using steel channels and gratings would have been vulnerable to corrosion caused by battery acid. It would also have required regular painting and ongoing maintenance to preserve its condition.

Installed Solution

Invicta ANARA installed glass-reinforced polymer profiles and 38 mm-deep d² grating across the two battery-storage sump areas. The GRP system was selected to meet both the corrosion-resistance and load-bearing requirements of the project.

The profiles were cut to accommodate the different slopes within each sump pit without compromising the strength of the system. Drainage holes were also drilled into the profiles, allowing any leaked battery acid to pass through the flooring and drain into the sump below.

The lightweight components were easier to handle than equivalent steel profiles and gratings, supporting efficient installation within the battery-storage areas.

Key Benefits

GRP profiles and gratings do not require painting for corrosion protection, reducing the need for regular maintenance. Their resistance to battery acid helps protect the integrity and performance of the flooring system within the storage areas.

The components are also lighter than equivalent steel profiles and gratings. This makes them easier to install and allows individual sections to be removed more easily for maintenance, relocation or recycling.

The completed system provides a load capacity of up to 17.5 kN/m² while allowing leaked battery acid to drain into the sump pits below.

End Results